Accord Arena is an indoor sports arena and concert hall located in the neighborhood of Bercy, on boulevard de Bercy, in the 12th arrondissement of Paris.
In 2014, Ateve ingenierie participated in the renovation project of Accord Arena.
During renovation project of Accord Arena, Ateve ingenierie is involved in repairs works of public area. The program includes restoration of insulation, waterproofing coating for outdoor surfaces, installation of accessibility facilities.
Mise en oeuvre de terre végétale |
---|
Verrière principale |
Pointe sud |
Verrière principale |
Reprise étanchéité des talus enherbés |
Pose du platelage bois |
Pointe Nord en chantier |
Passerelle pietonne |
Hall principal |
Structure métallique pointe Sud |
Dalles Lanhelin/Kastell/Louvigné |
Gradins |
Clients : SAE POPB
Maître d’ouvrage Délégué : SEMAEST
Lieu : Paris (75)
Partenaires :
Daniel Vaniche et associés (Architecte mandataire)
DVVD (Architectes associés et BET Structure)
ALTO ingénierie (BET Fluides et HQE)
SEPIAGC (BET Géotechnique et Génie Civil)
PEUTZ&ASSOCIES (BET Acoustique)
POPULOUS (Architecte spécialisé Arénas)
GARDINER&THEOBALD (Economiste de la construction)
SYSTAL (BET Cuisine)
ZAGASS DESIGN (Concepteur de signalétique)
CABINET 4C (BET Amiante)
Total cost: 96 000 000 € H.T.
Certification : Plan Climat Ville de Paris
Montant des travaux de VRD : 3 730 000 € H.T.
Surface : 62 000 m²
Surfaces extérieures réhabilités : 20 000 m2
Date d'achèvement de l'ouvrage : Septembre 2015